Specifying track and field equipment starts with understanding how the facility will be used and what level of competition it needs to support.
Equipment requirements, placement, and installation need to be coordinated with the larger site plan. Some pieces are installed during construction, while others are added after the track and field surfaces are complete.
UCS manufactures track and field equipment to World Athletics, USATF, NCAA, and NFHS specifications and provides technical sheets and installation guides to support the planning process.
What a Full Event Equipment Package Includes
A complete track and field package includes equipment for running, jumping, and throwing events. Each group has different installation and site-planning requirements, so it helps to view the project by event rather than treat the equipment as one general package.
Contractors can review the full UCS Track & Field range while building the equipment schedule.
Running Events
Running events rely mostly on equipment that is added after the track surface is complete, including competition and training hurdles, starting blocks, lane curbing and gates.
Jumping Events
Jumping events require more coordination because they include larger landing systems and in-ground components. High jump and pole vault each use landing systems, standards, and crossbars, while pole vault also requires a cast aluminum vault box and box collar. Long jump and triple jump areas include in-ground pits and take-off boards.
Contractors should account for these larger components early in the project so the event areas can be coordinated with the overall site plan.
Throwing Events
Throwing areas require cages, netting, sector padding and barricades, and the appropriate implements. Indoor facilities may use different cage configurations, including two-part systems with doors built into the structure.
Throwing cages should also be determined early because some configurations require coordination with the concrete phase.
Specifying to Competition Standards
The first step in specifying equipment is determining the highest level of competition the facility will host. That decision helps establish the standards each event area and piece of equipment needs to meet.
World Athletics governs international and championship competition, the NCAA governs college competition, NFHS governs high school competition, and USATF sanctions events across levels in the United States. Contractors should specify equipment to the standard the venue will use and include that requirement in the bid documents.
UCS pole vault and high jump landing systems are available in configurations designed to meet or exceed applicable competition size specifications.
Certification applies to specific products rather than the entire equipment line. UCS event standards and crossbars include World Athletics certified options, and UCS publishes a list of certified products that spec writers can reference when building the equipment schedule.
Coordinating the Equipment Spec With the Site Build
One of the most important parts of the equipment specification is identifying what needs to be coordinated during construction and what can be installed after the surface is complete. Separating those items early helps contractors account for them in the correct phase of the project.
Surface-Set Equipment
High jump and pole vault landing systems sit on the finished surface rather than being anchored into the ground. UCS landing systems connect with the VTX Velcro-and-clip system, so they do not require embedded hardware.
The surrounding area still needs to be planned around the equipment. The landing-system footprint, runway, and runout should all be accounted for when the surfacing layout is developed.
Embedded and Concrete-Phase Equipment
Other components need to be coordinated with the concrete work. Throwing cages can use either ground sleeves set in poured concrete or a self-standing base with an anchor-plate connection to the slab. Ground sleeves need to be positioned during the concrete phase rather than added during final equipment installation. Ball-stopping and netting systems, and communication or timing boxes all need to be coordinated with the lane layout and finished apron.
The cast aluminum pole vault box is also set into the runway at the plant-box location. UCS provides installation guides for these components so contractors can account for the required placement during construction.
Sub-Base and Drainage
Drainage requirements depend on the event area and the overall site design. UCS cut sheets outline drainage capabilities for pit forms that require them, including long jump and water jump areas. Landing areas and throwing cages typically do not include built-in drainage, so any additional site drainage should be confirmed in the project drawings.
For pole vault areas, polymer platforms can also be used to keep the landing system off the ground and support moisture evaporation in wet conditions.
Certified Equipment and Bid Requirements
When an equipment schedule names a specific competition standard, products submitted as part of the bid should meet that requirement. This is especially important when substitutions are allowed, since similar products may not carry the same certification.
Writing the required certification into the specification gives contractors and owners a consistent way to evaluate proposed equipment. Safety components may also follow separate standards.
The qualification section of the bid can also address the supplier's experience with comparable facilities and competition levels. UCS is the exclusive supplier of USATF through 2035 and has supplied equipment for U.S. Olympic Trials and international competitions. References from similar installations can give owners additional support when evaluating the proposed supplier.
Frequently Asked Questions
What Should Be Included in a Track and Field Equipment Specification?
A track and field equipment specification should identify the equipment required for each event, the competition standard the facility must meet, and any installation requirements that need to be coordinated with the site work. Technical sheets and installation drawings can then be included with the bid package.
Which Track and Field Equipment Needs to Be Coordinated With Concrete Work?
Ground-sleeve throwing cages and cast aluminum pole vault boxes need to be coordinated with the concrete phase. High jump and pole vault landing systems sit on the finished surface and do not require ground anchoring.
What Competition Standards Should Track and Field Equipment Meet?
The required standard depends on the level of competition the facility will host. World Athletics, USATF, NCAA, and NFHS have different requirements, and certification should be confirmed for each product included in the specification.
How Early Should Contractors Order Track and Field Equipment?
Most made-to-order UCS equipment has a three- to four-week production window. Larger landing systems, cages, and custom pieces may take up to eight weeks, so equipment should be scheduled alongside the concrete and surfacing work.
Spec the Package With One Supplier
A well-planned track and field project brings equipment standards, site requirements, and installation needs together from the beginning.
Contractors planning a new facility or renovation can explore the UCS Track & Field range and request a spec consultation or itemized quote based on the events, competition level, and construction schedule.
With the right equipment and documentation in place, contractors can build a more complete specification and coordinate each event area with the overall project.